Skip to main content

18G: Mountain View Corridor Waterline Betterments

Consultant: Parsons Transportation Group, Inc. and CRS Engineers

Contractor: Mountain View Corridor Constructors (A Kiewitt-Clyde Joint Venture)

Status: Installation of the waterline betterments within the 3500 South right-of-way has been intermittent. The steel casing for the Balmoral Townhomes sewer under the MVC embankment has been installed. The sewer carrier pipe installation is in progress.